The SMAW WPS for E7018 on ASTM A36 is the workhorse of structural welding. Every fab shop has one. Here is what a complete, audit-clean version looks like under AWS D1.1:2025.
Identification block
WPS number: WPS-25-001
Revision: 0
Date: 2026-05-08
Code: AWS D1.1/D1.1M:2025
Scope: SMAW production welds on ASTM A36, Group I, thickness 1/8 in to 3/4 in, in 1G / 2G / 1F / 2F positions
Status: Prequalified per AWS D1.1:2025 Clause 5
Process and joint
Process: SMAW (Shielded Metal Arc Welding), manual
Joint detail: B-U2 prequalified groove from Clause 5 (V-groove with backing), or B-L1 (V-groove with backgouging)
Joint sketch: embedded as figure 1
Base metal
Specification: ASTM A36
Group number: I (per Table 6.9 in 2025)
Thickness range: 1/8 in (3.2 mm) to 3/4 in (19 mm)
Diameter range: N/A (plate)
Filler metal
AWS classification: A5.1 E7018
Hydrogen designator: H4 or H8
Diameter range: 3/32 in, 1/8 in, 5/32 in
Storage: rod oven at 250°F [120°C] minimum after seal break; max 4-hour exposure before redrying
The hydrogen designator is essential — many audit findings cite WPSs that list "E7018" without H4/H8.
Position
1G, 2G groove (flat, horizontal)
1F, 2F fillet (flat, horizontal)
Progression: N/A (flat and horizontal only)
Electrical
Current: DC
Polarity: DCEP (Direct Current Electrode Positive, reverse polarity)
Amperage range:
3/32 in electrode: 70–110 A
1/8 in electrode: 105–145 A
5/32 in electrode: 140–190 A
Travel speed range: 4–8 ipm (depends on bead and position)
Arc voltage: 22–28 V (typical for E7018; not directly set by welder on SMAW)
Preheat and interpass
Minimum preheat: 32°F [0°C] for thickness ≤ 3/4 in with H4 filler (per Table 5.8)
Maximum interpass: 500°F [260°C] (typical for non-CVN structural work; CVN-required work is tighter via Table 6.8)
Method of measurement: temperature-indicating crayon, calibrated; measure 3 in [75 mm] from joint centerline before striking arc
Technique
Bead style: stringer beads preferred; weave beads acceptable up to 3× electrode diameter
Cleaning: slag chipped + wire brushed between passes; visible slag inclusions ground out before next pass
Peening: intermediate passes may be peened to relieve stress; root and cap passes not peened
Electrode angle: 5–15° drag for flat, 0–10° push for horizontal
Joint preparation
Cleaning: mill scale removed within 1 in [25 mm] of weld; rust, oil, paint removed within same band
Fit-up: root opening per joint sketch ± 1/16 in [1.6 mm]
Tack welds: maximum 1-1/2 in [38 mm] long at 8 in [200 mm] spacing; tack welds inside the joint groove fully melted into the root pass
Signature
Prepared by: [name], [credential], [date]
Approved by: [CWI name], CWI #[number], [date]
Common pitfalls on this WPS
Missing hydrogen designator — listing "E7018" without H4 or H8. Auditor flag.
Preheat listed for room temperature without method specified — incomplete.
Single amperage value instead of range — most common across all SMAW WPSs.
Joint sketch missing or referenced by label without embedding — auditor flag.
Storage rules omitted — particularly important for low-hydrogen electrodes; humidity can defeat the H-designator.
A rule engine that cross-references Table 5.6 (A36 → Group I up to 3/4 in), Table 5.7 (Group I → E7018 match), Table 5.11 (preheat by category and thickness), and Clause 5 Figure 5.1 (B-U2 / B-L1 joint geometry) catches all five at draft time.
FAQ
Frequently asked.
Is SMAW on A36 with E7018 prequalified under AWS D1.1?
Yes, in most configurations. A36 is Group I per Table 6.9. E7018 (A5.1) is matched per Table 5.4. As long as the joint geometry is from Clause 5 (Figures 5.1 to 5.3) and preheat meets Table 5.11 minimums, the WPS is prequalified per Clause 5.
What electrode diameter is typical?
1/8 in (3.2 mm) is the most common diameter for shop work in the flat and horizontal positions. 5/32 in (4.0 mm) for thicker passes; 3/32 in (2.4 mm) for thin plate or root passes in restricted positions.
What preheat does A36 need?
For A36 (Group I) up to 3/4 in thick with low-hydrogen E7018 (H4 or H8 designator), Table 5.8 typically allows preheat as low as 32°F [0°C]. Above 3/4 in, preheat rises. Above 1-1/2 in, preheat is typically 150°F [65°C] or higher.