The majority of structural CJP groove welds in shop fabrication use steel backing: a flat bar tack-welded to the back face of the joint that lets the welder burn through cleanly without worrying about burn-through or complete root fusion. It simplifies procedure qualification, reduces joint fit-up sensitivity, and is the basis for most prequalified WPS setups under AWS D1.1.
But steel backing is not always possible. Field connections with restricted rear access, pipe and HSS connections where interior backing cannot be placed, and certain architectural joints where the backing bar would be visually objectionable all create demand for the alternative: a CJP groove weld deposited from one side only, with no backing behind the root.
This article covers what AWS D1.1:2025 requires when you go down that path.
Why Backing Condition Is an Essential Variable
AWS D1.1:2025 Table 6.6 lists the essential variables that, when changed, require a new PQR or a re-qualified WPS. For SMAW, GMAW, FCAW, and GTAW, deletion of backing appears explicitly as an essential variable. This is not a technicality — it reflects a real difference in joint execution.
When steel backing is present, the root bead is deposited against a solid face. The welder can run a generous root pass, slight burn-through is tolerated, and incomplete joint penetration on the backing-bar face does not create a discontinuity in the structural weld metal. Without backing, the root bead must achieve complete fusion on its own. The unsupported puddle behaves differently, droop potential increases, and position effects become more pronounced.
If your existing WPS was qualified with steel backing, you cannot pull the backing bar in production without invalidating the procedure. A new PQR conducted without backing — or a qualified WPS that explicitly covers the no-backing condition — is required. This distinction must appear in Annex J Form J-1 when completing the procedure documentation: the backing field (yes/no, material if yes) must accurately reflect the qualified condition.
Prequalified Open-Root CJP Joints Under Clause 5
AWS D1.1:2025 Clause 5 defines the prequalified WPS requirements, including which joint geometries qualify without a PQR. The CJP joint details appear in Figures 5.1 (groove welds, various configurations). Several designations within those figures include open-root options with no backing material.
For a prequalified open-root joint, the following must hold:
Root opening and root face tolerances are tight. Unlike a backed joint where root opening can float more because the backing catches any puddle droop, open-root joints have narrow dimensional windows. If fit-up drifts outside the tolerance shown for the joint designation in Figure 5.1, the joint is no longer prequalified and a PQR is required to qualify it at the actual dimensions.
Process matters. Not every process has prequalified open-root joint options in Clause 5. GTAW is frequently used for open-root root passes in structural work because of its precise heat control, often followed by FCAW-G or SMAW fill passes (a multi-process WPS). If the process you intend to use for the root pass is not covered in a Clause 5 prequalified open-root detail, you need a PQR.
All other Clause 5 requirements apply. Filler metal classification, preheat per Table 5.11, base metal eligibility per Table 5.6, and position limits all still control. Prequalified status for the joint geometry does not exempt the WPS from the remaining Clause 5 requirements.
Qualification by Test for Open-Root CJP
When the joint geometry falls outside Clause 5 prequalified limits, or when the process choice is not covered by a prequalified detail, a PQR is required. The PQR for a CJP open-root weld without backing must be performed with the actual joint configuration, process, filler metal, and position.
Position qualification is not transferred. A CJP open-root WPS qualified in the 2G (horizontal) position does not cover the 3G (vertical) position. For groove welds, AWS D1.1:2025 Table 6.6 identifies position as an essential variable — a change to a more restrictive position requires requalification. The practical implication for open-root CJP work is that if the production joints will be welded in multiple positions, the PQR coupon must be run in the most restrictive position, or separate PQRs must be run for each position not covered by the qualified range.
Test specimen requirements. For groove weld PQR qualification under Clause 6, the standard mechanical test suite applies: tensile tests, guided bend tests (face, root, and side bends depending on thickness), and potentially CVN Charpy impact testing if the contract documents require notch toughness per Table 6.8. The root bend test is particularly revealing for open-root welds — it bends the root region in tension, exposing any incomplete fusion or lack of penetration at the original root pass.
CWI witness of the PQR weld. AWS D1.1:2025 Clause 6.5.1 requires that the PQR be witnessed by the inspector or qualified representative. For open-root procedures, the witness should observe the root pass deposition specifically — not just the completed weld — because root pass technique (arc length, travel speed, manipulation) is where most open-root failures originate.