Most structural welding drawings keep weld symbols simple: a reference line, a fillet or groove symbol on the appropriate side, a size, and sometimes a length. But occasionally a fork-shaped tail appears at the left end of the reference line — and that tail can carry information that changes how the welder approaches the joint and how the CWI inspects it.
AWS A2.4 (Standard Symbols for Welding, Brazing, and Nondestructive Examination) is the governing standard for weld symbol notation. This article explains the tail, what can legally go there, what fabricators commonly put there, and how CWIs use it during inspection.
The anatomy of a weld symbol tail
In the AWS A2.4 system, the standard weld symbol consists of:
- Arrow: Points to the joint location
- Reference line: Horizontal line connecting to the arrow
- Weld symbol: Placed below (arrow side) or above (other side) the reference line
- Dimensions: Size, length, and pitch adjacent to the weld symbol
- Supplementary symbols: All-around, field weld, melt-through, backing, etc.
- Tail: A fork at the end of the reference line opposite the arrow
The tail is explicitly defined in AWS A2.4 as the location for "specification, process, or other reference." The standard is intentionally permissive: it does not limit what can appear there, but the content must be clearly interpretable by both the welder and the inspector. When nothing needs to be called out, the tail is omitted entirely. Its absence does not mean anything is missing — it simply means the drawing author had no supplementary information to add.
What fabricators and engineers put in the tail
In structural steel practice, four categories of information appear most often in weld symbol tails:
1. Welding process designation
Abbreviations from AWS A2.4 Annex A — SMAW, FCAW-G, GMAW, SAW, GTAW, and others — can appear in the tail to specify which process must be used for a joint. This is common when:
- A project specification restricts certain processes in specific locations (for example, prohibiting FCAW-S in fatigue-critical zones or requiring GTAW for the root pass on pipe penetrations).
- Different process requirements apply to shop and field welds on the same member, and the engineer wants to make the distinction explicit on the drawing.
When a process is specified in the tail, the WPS covering that joint must also be qualified for that process. A welder substituting SMAW for a FCAW-G tail callout — even if the SMAW WPS covers the same base metal and joint type — is out of compliance.
2. WPS number
On projects with a formal welding procedure library, the structural engineer or fabricator may populate the tail with the specific WPS number that applies to the joint — for example, "WPS-12" or "P-A36-FCAW-2F." This removes any ambiguity about which procedure covers the joint when multiple WPSs in the library could technically qualify it by their essential variable ranges.
From a QC standpoint, tailing a specific WPS number is both a help and a responsibility. It is a help because the inspector can verify the exact WPS at the weld location without cross-referencing base metal, position, and process. It is a responsibility because the WPS number must be kept current: if WPS-12 is revised and renumbered, the drawings must be updated or a revision note issued, or the tailed number becomes stale. See WPS revision control best practices for how to manage this in a library.
3. Reference standard or specification section
A tail can point to a standard or project specification rather than a WPS number. Examples:
- "AWS D1.1" — confirms the joint must comply with AWS D1.1 (useful when multiple codes apply to a project).
- "Spec. Sect. 05120, Para. 3.2" — references a section of the project specification containing welding or NDE requirements.
- "AISC 360 Sect. J2" — calls out a specific code provision governing the joint design.
This form of tail is more common on institutional or owner-driven projects (hospitals, government buildings) where the QC inspector verifies not just the physical weld but also the traceability of the joint back to a specific contract document.
4. NDE requirements
Inspection method callouts in the tail are used when NDE is required for specific weld locations rather than applied project-wide. Common forms:
- "UT" — ultrasonic testing required on this joint
- "RT" — radiographic testing required
- "MT" — magnetic particle testing
- "PT" — liquid penetrant testing
The tail notation for NDE supplements (and does not replace) the NDE plan required by AWS D1.1. When spot NDE applies to a percentage of joints, the tail method of calling it out is less common than a general drawing note or a separate inspection plan. But for joints that must be 100% UT regardless of the project's general NDE sampling rate — seismic-critical or tension-loaded CJP groove welds, for example — a tail callout on those specific weld symbols communicates the requirement directly to the erector and inspector at the joint level.