Anchor rods embedded in concrete foundations are the structural interface between the building frame and its foundation — transferring column base shear, tension, and moment to the concrete. The welded connection between ASTM F1554 anchor rods and their embed plates or template washers is a structural weld that many shops treat as routine fabrication, but it carries real code obligations under AWS D1.1:2025 and IBC Chapter 17 special inspection requirements.

This article covers what CWIs and fab shop QC managers need to know: which F1554 grades are prequalified, when a PQR is required, how to select filler metal and preheat for each grade, and what the IBC special inspection record must contain.

F1554 Grade Overview and Weldability

ASTM F1554 covers anchor bolts and rods in three yield strength grades:

Grade Fy min (ksi) Fu min (ksi) AWS D1.1 Status
36 36 58–80 Prequalified
55 55 75–95 Prequalified
105 105 125–150 Not prequalified — PQR required

The weldability difference between the grades is significant. Grade 36 behaves like A36 plate — forgiving chemistry, low CE, minimal preheat needed for most rod diameters. Grade 55 has a controlled chemistry that keeps CE in check despite higher strength. Grade 105 is a quenched and tempered (Q&T) product; its CE typically runs 0.60 or higher, and the heat-affected zone is sensitive to hydrogen-assisted cold cracking.

Rule: Always calculate CE from the MTR for the specific heat of F1554 rod being welded. Do not assume the grade chemistry matches a prior order from the same supplier.

Prequalified WPS for F1554 Grade 36 and Grade 55

For Grade 36 and Grade 55, a prequalified WPS under AWS D1.1:2025 Clause 5 is the standard path. The WPS must document:

Joint design. Anchor rod-to-plate connections are typically:

  • Fillet weld around the perimeter of the rod where it passes through a template plate (plug-type or perimeter fillet)
  • Bevel groove weld at the rod-to-base plate connection when full-penetration strength transfer is required by design
  • Double-fillet weld at a rod-to-washer plate sandwich configuration

Prequalified joint geometries from AWS D1.1:2025 Annex B apply. Fillet weld sizes must meet minimum size requirements based on the thicker part joined — typically the embed plate or base plate thickness, not the rod diameter.

Filler metal. E7018 (SMAW) for Grade 36 rods. For Grade 55 rods, the higher-strength base metal warrants E7018 or E8018 to ensure adequate tensile compatibility. Low-hydrogen electrodes (H8 or better) are required for Grade 55 in diameters above 1-1/4 inch due to the restraint of the round rod geometry and the heat sink of the connected plate.

Preheat. Grade 36 rods in typical diameters (3/4 to 1-1/4 in) with CE below 0.45%: minimum 50°F preheat. Grade 55 rods with CE in the 0.45–0.55% range: 150–200°F preheat. Verify with contact pyrometer at the rod and the plate, measured 3 inches from the weld.

Position. Embed plate welding typically occurs in the flat (1F/1G) position in the shop. Field installation of additional weld passes at erection (rare but occurs on heavy industrial jobs) may require vertical (3F) or overhead (4F) qualification on the WPS.

Tested WPS for F1554 Grade 105

Grade 105 is not in the prequalified base metal list. Any WPS for welding Grade 105 anchor rods requires qualification by test under AWS D1.1:2025 Clause 6, documented on a PQR.

The essential variables that govern qualification under Table 6.6 include:

  • Base metal group change: qualification on Grade 105 does not qualify Grade 36 or Grade 55 (different base metal groups)
  • Filler metal classification: changing from E9018 to E10018 is an essential variable change requiring requalification
  • Preheat decrease: lowering preheat below the PQR-tested minimum is a requalification trigger
  • Position: welding in a position not covered by the PQR position qualification range requires requalification

For the PQR test coupon, the test plate or pipe must represent the production joint geometry. A fillet weld macro test (macro etch examination) on a fillet weld PQR specimen demonstrates fusion, throat, and HAZ characteristics for Grade 105. Macro etch reveals the quenched and tempered microstructure and confirms there is no HAZ cracking or softening anomalies.

Controlled heat input is mandatory for Grade 105. Excessive heat input destroys the Q&T microstructure in the HAZ, reducing hardness and strength. The WPS should specify a maximum heat input (kJ/in) based on the qualified range — this is an essential variable change if exceeded in production.

Preheat for F1554 Grade 105

Grade 105 carbon equivalent values vary significantly by supplier. Published typical values range from 0.58 to 0.75 CE. At CE = 0.65 and a rod diameter of 1-1/2 inches:

  • AWS D1.1:2025 Table 6.3 preheat: minimum 200°F
  • Many structural engineers specify 250°F for Grade 105 regardless of CE
  • Hydrogen bake-out (PWHT at 400°F for 1 hour) is sometimes required by owner specifications on high-restraint joints in seismic or fatigue-critical applications

Soak time matters on thick rods. A 2-inch-diameter Grade 105 rod requires sufficient soak time at preheat temperature to drive moisture from the rod surface and warm the rod through its cross-section — not just the surface. Allow at least 10–15 minutes at preheat temperature before striking the first arc.

Post-weld slow cooling. AWS D1.1 does not mandate PWHT for Grade 105 anchor rod welds in routine structural applications, but the WPS should prohibit rapid quench cooling (water quenching, compressed air cooling) after welding. Covering the joint with an insulating blanket for 30–60 minutes is good practice on large-diameter Grade 105 rods.

Common Embed Plate Configurations

Column base plate welds. The embed plate is the base plate itself. Anchor rods project through oversized holes in the base plate or are welded to the underside of the base plate with a fillet weld. In either case, the weld is a fillet weld in the flat position — straightforward, but the WPS must specify the minimum and maximum fillet weld size for the base plate thickness.

Leveling plate and template assemblies. On large equipment foundations, anchor rods are set in a template frame before concrete placement. The template frame welds are structural steel-to-structural steel, typically SMAW or FCAW-G in the shop. Template frames are usually A36/A572 steel; the rod connections to the template are fillet welds per the structural engineer's details.

Haunch and pier cap embeds. Structural embeds in concrete piers and caps for bridge beams involve stud-welded shear connectors as well as anchor rod connections. Stud welding is governed by AWS D1.1:2025 Clause 7 and is a separate WPS / qualification process from anchor rod welding — do not use the anchor rod WPS for the stud welding operation.

IBC Special Inspection Documentation

IBC Chapter 17 Table 1705.2 requires special inspection for structural steel welding, including anchor rod welds. The special inspector (typically a CWI or IBC-qualified special inspector) must document:

  • Prior to welding: WPS number and revision, filler metal lot and classification, joint fit-up and geometry, preheat temperature measured
  • During welding: interpass temperature (for multi-pass welds on Grade 55 and 105), welder ID stamp or badge
  • After welding: visual inspection result — weld profile, undercut, surface porosity, crater fill — per AWS D1.1 visual acceptance criteria

In SDC D/E/F seismic design categories, special inspection of anchor rod welds is typically continuous (inspector present for each weld). In lower SDC, periodic inspection may be permitted per the statement of special inspections — confirm with the project's geotechnical engineer of record and the AHJ.

Special inspection records feed directly into the building permit closeout package. Missing or incomplete CWI inspection records for anchor rod welds have held up certificate of occupancy in jurisdictions with active building departments.

Record Retention and WPS Traceability

The anchor rod embed plate WPS, the welder WPQ, and CWI inspection records should be retained for the life of the structure. Foundation welding records are not like finish welding records — they are permanent structural records. Keeping WPS, PQR, welder qualifications, and inspection logs in a centralized digital platform avoids the scenario where a structural modification 10 years later triggers a records hunt that goes nowhere. See how purpose-built WPS management works for fab shops.

Rule library based on AWS D1.1:2025. Verify against your governing edition — the AHJ or contract may specify 2020 or an earlier edition.

Related Reading

FAQ

Frequently asked.

Does AWS D1.1 cover welding of ASTM F1554 anchor rods to base plates?
Yes. When the project specification invokes AWS D1.1 for structural steel welding, ASTM F1554 anchor rod-to-plate connections are governed by it. F1554 Grade 36 and Grade 55 rods are in the prequalified base metal group. Grade 105 is not prequalified and requires a tested WPS with PQR. Always confirm the project specification — some bridge and DOT projects invoke AASHTO or project-specific weld procedures instead.
What preheat is required for F1554 Grade 105 anchor rods?
F1554 Grade 105 is a quenched and tempered high-strength steel with carbon equivalent values typically in the 0.60–0.75 range depending on the heat. AWS D1.1:2025 preheat requirements per Table 6.3 for this CE range and typical anchor rod diameters (1–2 inches) demand 200–300°F minimum preheat. The MTR CE must be calculated for every heat used in production.
Can I use a prequalified WPS for F1554 Grade 55 anchor rod welding?
Yes. F1554 Grade 55 (Fy = 55 ksi, Fu = 75 ksi) is in the AWS D1.1:2025 prequalified base metal group. A prequalified SMAW WPS with E7018 or E8018 filler, correct joint geometry per Annex B, and preheat per Table 6.3 based on the actual MTR CE is valid without PQR testing. Verify wall thickness and position qualification cover production conditions.
Is IBC special inspection required for anchor rod welds on high-seismic projects?
Yes. IBC Chapter 17 requires special inspection for structural steel welding, and anchor rod welds to embed plates are structural welds. In high seismic design categories (SDC D, E, F), special inspection is continuous for demand-critical welds. CWI inspection records must document weld size, WPS used, preheat, welder ID, and visual acceptance.